    Name of project: Coal Mine Gas Fathering & Utilization Demonstration Project of Longmay Group Hegang Branch Company(The annual utilization volume of pure gas is 50 million m3,the quantity of users will be increased from 30,000 to 150,000)
    Scale of project: The annual utilization volume of pure gas is 50 million m3,the quantity of users will be increased from 30,000 to 150,000.
    Brief description on the project: Coal-bed gas is a kind of clean fuel energy source. The total reserve of coal-bed gas in Hegang mine region is 34.7 billion m3,there are advantageous drainage conditions and mature drainage technology. In the project, on basis of the present gas drainage and utilization in South Mountain Mine, reconstruction and extension works will be implemented, so to make the utilization scale of drained gas in the mine reach 50 million m3 in every year, increase the quantity of users from 30,000 to 150,000. It is planned to complete the project within three years. The feasibility study report has been prepared and approved.
    Sales direction of product: domestic sale
    Investment estimate and source: The total investment is US$77.2603 million, the investment proportion may be negotiated about.
    Cooperation means: joint venture, cooperation.
    Estimated economic benefit after the project construction is completed: the annual output value is US$30.8219 million and the annual profit is US$10.5616 million.
    Brief introduction to domestic investor:
    1. Name of investor: Longmay Group Hegang Branch Company
    2. Present enterprise status: Longmay Group Hegang Branch Company is an important national base on energy source and one of 520 major enterprises. It has 9 production mines, the annual production ability is 17 million tons; 5 coal dressing plants, the determined ability is 7.8 million tons in every year. The company has one thermal power plant, the total installed capacity is 150,000KW, the annual power-generating ability is 975 million KWH, the heat supply ability is 4 million m2; the annual output of industrial dynamite of the Powder Factory is 18,000 tons, the annual output of electric detonator is 65 million pieces; the annual output of cement factory is 200,000 tons; the reserve of coal-bed gas is 34.7 billion m3. Coal-bed gas was firstly utilized in 1993, a civil fuel gas supply system with supply ability 40,000 m3/day was built.


    Register to be our membership and you will enjoy more services. Register Now

    If you are interested in this project info and prefer to see the full information about it, you can purchase it. This price of is USD28, and you can pay the money through Paypal or Contact us. Or welcome to be our paid membership and enjoy the service of 100,000 pieces of information each year (Please check: service list)

Purchase this information

Note: Please leave your E-mail Address, Name and Tel. After your payment, this tender information will be sent to your E-mail box.
Name :
E-mail:
Tel.:
  • Login
  • Subscribe